In the latest Malta Budget for 2026, Gozo once again feels like the slightly ignored cousin at the family dinner, the one who’s warmly greeted, handed a glass of wine, and then told, “We’ll get to your needs next year, promise.”
The government has been keen to showcase what it calls “record investment” for Gozo, highlighting a jump in capital spending from €15.2 million to €27.5 million, and an increase in recurrent expenditure from €77.9 million to €94.5 million. On the surface, those figures look like a major upgrade. But once you look past the headline, the picture becomes more modest. Much of the supposed increase appears to come from reclassified items and previously announced spending, rather than new, Gozo-specific investment.
When you focus on the Ministry for Gozo and Planning’s actual identifiable allocations, the money Gozo genuinely controls, the rise is far smaller: a slight lift in recurrent funds and only a couple of million more in capital spending. And that’s where the quiet humour of it all lies: the Budget sounds generous until you read the fine print. For Gozitans still waiting on long-promised projects the courthouse, the hospital rebuild, the breakwater, the ring road the glossy totals feel a lot louder than the actual delivery.
But zoom in, and most of that money goes to the basics, keeping the lights on, routine maintenance, small upgrades, and admin. Not the major projects Gozitans have been hearing about for years, those upgrades remain firmly parked in the “pending” column.
The Finance Minister’s speech was full of grand words like resilience, prosperity and “no one left behind”, yet the paragraphs dealing with Gozo quietly suggest something closer to “Please hold. Your call is important to us.”
Free Promises come Cheap
1️⃣ New Gozo Courthouse: promised 2013
2026 reality: ❌ No mention, no funding
Why it matters: Justice still being served in a building older than most case files
2️⃣ Marsalforn Breakwater: promised since 2019 (renewed in 2022)
2026 reality: ❌ No capital allocation
Why it matters: Each winter storm reminds residents that paperwork isn’t protection
3️⃣ New Gozo Hospital: promised 2015
2026 reality: ⚠️ Upgrades only; full rebuild still pending
Why it matters: Healthcare progress shouldn’t move at the pace of erosion
4️⃣ Helicopter / Air Link — first pledged 2007
2026 reality: ⚠️ Ideas and visuals, but no funded commuter service
Why it matters: The island’s “air connection” remains strictly conceptual
5️⃣ Passenger Fast Ferry: promised 2013, delivered 2021
Vehicle fast ferry: Still not committed
Why it matters: Great for day-trippers, not for business owners hauling actual stock
6️⃣ Gozo Channel Fleet — “temporary” fix since 2019
2026 reality: ❌ Still no new ferry commissioned
Why it matters: A key lifeline is still reliant on a stopgap solution
7️⃣ Victoria Ring Road: proposed since at least 2008
2026 reality: ❌ Still stuck in planning limbo
Why it matters: Victoria remains an island-sized roundabout
8️⃣ Manikata Road: major issue flagged since 2017
2026 reality: ❌ No dedicated upgrade
Why it matters: Still one hazardous bottleneck between Gozo and the rest of Malta
The Real-Life Problems Budget 2026 Didn’t Fix for Gozo
Anyone who has waited in the Ċirkewwa ferry queue knows the moment: the slow, hopeful crawl of cars inching forward… right up until a convoy of ministry vehicles sweeps past with a police escort. Nothing quite says, “Yes, the problem exists — just not for us,” like that drive-by. It’s a painfully efficient reminder of how inefficient the system is, especially for an island whose entire connection to the rest of the country still hinges on that same bottleneck.
And the same feeling follows you on land. Drive into Victoria at the wrong time of day and you quickly discover that Gozo’s missing ring road isn’t just a planning oversight, it’s a daily test of patience. Traffic that should be skirting the town gets funnelled straight through the centre instead, turning every errand into an urban obstacle course. Tourists, residents, delivery vans, and commuters all competing for the same narrow streets simply because a bypass that’s been discussed for decades never materialised.
Then there’s the courthouse, which is past the point of “charming old building” and well into “please don’t lean too hard on that wall.” Employees work in cramped rooms, the public queues in corridors designed for a different era, and the entire complex feels like it’s waiting for a long-promised replacement that never arrives.
And of course, the hospital. While small upgrades trickle in, the long-promised new hospital wing, the modern, purpose-built extension Gozo has needed for years, remains stuck in the conceptual stage. Patients are still being treated in ageing sections originally meant as temporary solutions, and staff continue working around the limitations of a building that should have been expanded by now. For a growing island, health care shouldn’t have to rely on such improvisations.
Put together, these everyday scenes — the ferry queues, the Victoria gridlock, the courthouse in disrepair, the hospital waiting for its long-promised expansion — paint a clearer picture than any budget speech. Gozitans don’t need a list of priorities; they live them. And each delay, each detour, each “next year” quietly reinforces the same message: the island’s needs aren’t complicated, they’re just overdue.
The 2026 Budget: The Traffic Light Verdict
🟥 Breakwater – Not funded
🟥 Vehicle fast ferry – Not funded
🟥 Gozo Court – Not funded
🟥 Ring Road – Not funded
🟥 Manikata Road – Not funded
🟧 Hospital – Partial upgrades
🟧 Air link – No operational funding
🟩 Local upgrades (parks, schools, cultural sites) – Delivered
Time to Pile on the Pressure, Gozo
Gozo is a place defined by warmth, generosity, and patience. But patience has its limits, especially when essential infrastructure is delayed year after year while other regions receive bold, headline-grabbing investment.
For more than a decade, Gozitans have been promised the same basic assets any modern region deserves: a safe access road, a functioning courthouse, a hospital that meets today’s needs, ferries that don’t feel temporary, and coastal protection that exists outside PowerPoint slides.
Yet the island keeps being reassured that progress is coming “soon.”
And “soon” has lasted long enough.
Gozo doesn’t want special treatment, it wants fair treatment. It wants commitments that turn into construction, not more campaign-season slogans. It wants budgets that reflect the island’s contribution to the country, not its population size.
If anything needs to change, it’s not Gozo’s expectations, it’s the volume of its voice. Gozitans have every right to demand the same standards enjoyed elsewhere: safe roads, a functioning court, a modern hospital, reliable transport, and investment that goes beyond ribbon-cutting ceremonies. These aren’t luxuries; they’re basic infrastructure.
The island has been patient long enough. Now is the moment for residents, business owners, and community groups to speak louder, push harder, and insist that promises stop being decorative and start being delivered. Gozo deserves more than gratitude and good intentions. It deserves results — built, opened, and finally operational.
For more daily updates, follow us across our social media channels.